Welcome to Nova Abode, a thoughtfully designed residential development by Miaka Nova Limited, offering a blend of modern architecture, functional spaces, and value-driven investment options. Set in the tranquil yet highly connected neighborhood of Lower Kabete, this project is ideal for homeowners and investors seeking affordability without compromising on quality or convenience.
A Lifestyle Designed Around You
Nova Abode offers a wide selection of spacious, well-finished units including:
-
Premium Two Bedroom Apartments (85 sqm)
-
Standard Two Bedroom Apartments (70 sqm)
-
Premium One Bedroom Apartments (47 sqm)
-
Mini One Bedroom Apartments (35 sqm)
-
Premium Studio Apartments (28 sqm)
Whether you are a first-time homeowner, looking to upgrade, or investing in rental property, there’s a unit tailored to your needs—with rental yields of up to 9.3%, making it one of the most attractive investment opportunities in the area.
Amenities That Make a Difference
Nova Abode is built with modern living in mind. Residents enjoy:
-
Spacious rooftop terraces for relaxation and gatherings
-
Swimming pool and fully equipped gym for a healthy lifestyle
-
Ample parking spaces for residents and visitors
-
High-speed lift access in every block
-
Reliable water supply through an on-site borehole and underground storage
-
Security features including CCTV surveillance and 24/7 manned entry points
-
On-site property management office for ease of service and maintenance
-
Paved internal roads and direct access from the tarmac
-
Internet and TV connectivity pre-installed for convenience
Why Choose Nova Abode?
-
Affordable Pricing with units starting from KES 2.4M
-
Flexible 24-month payment plans to match your financial goals
-
Professional property management post-construction to help grow your passive income
-
High occupancy potential due to the project’s superior design and location compared to other developments in the area
-
Quality construction from a reputable developer with proven success (95% of their ongoing project already sold)
Project Timeline
-
Construction Start: July 2025
-
Completion: June 2027